National Infrastructure Landmark

1,000 Housing Units Development — Kano State

Official Contract Sum: ₦50,514,397,226.21

Client: Global Centre for Empowerment & Care for Life Challenges (GEDPAN) / Global Centre Modern City (GCMC)
Contract Reference: GCECLC/GEDPAN/171 • Contractor: Lassan Metal Mate Construction Company Limited

Comprehensive Bill of Engineering Measurement

Housing Typologies & Cost Breakdown

Detailed technical and budgetary summary of the 1,000 housing units across four distinct residential categories in Kano State:

250 Units₦5,554,105,955.00

2-Bedroom Detached Bungalow

Unit Cost: ₦22,216,423.82

Affordable modern family bungalow with reinforced block masonry, long-span aluminium roofing, complete electrical and plumbing reticulation.

Key Architectural Features:
  • All En-suite Bedrooms
  • Spacious Living & Dining Lounge
  • Fitted Kitchen & Pantry
  • Front Porch & Concrete Paved Driveway
250 Units₦7,466,222,187.50

3-Bedroom Detached Bungalow

Unit Cost: ₦29,864,888.75

Spacious 3-bedroom detached residential bungalow engineered with high-ceiling airflow, POP finishes, and perimeter compound boundary.

Key Architectural Features:
  • Master Bedroom with Luxury Bath
  • 3 En-suite Rooms + Guest Restroom
  • Bespoke Joinery & Wardrobes
  • Solar Inverter Wiring Ready
250 Units₦14,481,834,395.00

4-Bedroom Detached Duplex

Unit Cost: ₦57,927,337.58

Two-storey executive residential duplex with reinforced concrete columns, architectural cantilever balconies, and luxury finishes.

Key Architectural Features:
  • Double-Volume Ante-Room
  • 4 En-suite Bedrooms + Family Lounge
  • Dedicated Maid Quarters (BQ)
  • Private Balconies & Stamped Concrete Yard
250 Blocks (1,000 Apartments)₦23,032,234,688.71

2-Bedroom Block of 4 Flats

Unit Cost: ₦92,128,938.75

Multi-family residential blocks engineered with heavy structural columns, central staircases, and communal infrastructure services.

Key Architectural Features:
  • 4 Independent 2-Bed Apartments per Block
  • Centralized Overhead Water Tank Stands
  • Dedicated Electric Metering per Flat
  • Civil Drainage & Perimeter Security
Grand Total Contract Value₦50,514,397,226.21Fifty Billion, Five Hundred and Fourteen Million, Three Hundred and Ninety-Seven Thousand, Two Hundred and Twenty-Six Naira, Twenty-One Kobo.